  Terms & Conditions

EVOLVEnow Lead Time (based on list prices)
$0 - $150,000 = six (6) business days
$150,001 - $200,000 = ten (10) business days
$200,001 and over = twelve (12) business days

Fabric and model numbers are limited to the products stated on this website and in the EVOLVEnow list price book.

Lead times are based on receipt of a clean order.

EVOLVEnow Limited Warranty will follow the standard Evolve's Limited Lifetime Warranty. This can be found in our current Evolve List Price Book.

If EVOLVEnow product is ordered along with standard product, the standard lead time will apply. Please place EVOLVEnow products on a separate order.

All EVOLVEnow orders must be sent via SIF files to the electronic order entry mailbox at evolvenow@evolvesystems.com. The complete cover sheet must accompany the order.

Standard freight charges (5% of list price) will apply to all orders under $10,000.

Keying alike is not an option on EVOLVEnow.

Due to expeditious lead times, EVOLVEnow orders cannot be cancelled.

Parameters for typical layouts
All workstations with over-storage will have cord covers
.

All panel trim is PVC.

All power is on the spine, the only exception is a basefeed (see individual typicals for locations).

All workstations contain (2) duplexes total, one is dedicated.

Over-storage is placed along the spine.

Dimensions noted on typical are outside dimensions only.

All workstations with 42"h panels only, contain storage under the worksurface.

All workstations with 54"h panels, on the spine, contain (1) low profile shelf and (1) 18" Low Wattage Task Light.

All workstations with 66"h panels, on the spine, contain (1) low profile shelf, (1) 13" Overhead Cabinet & (1) 18" Low Wattage Task Light.

All electric is fed by basefeed. Power pole and post extensions are standard lead time.

Dealer must field verify.

 